Skip to content
Serving Telford & Shropshire
TF Heating
Bathroom with walk-in shower, lit niche and herringbone floor, fitted by TF Heating

Bathroom Plumbing & Fitting in Telford

Showers, baths, basins and full bathroom plumbing

We do the plumbing side of bathrooms across Telford and Shropshire: showers, baths, basins, toilets, waste connections and full bathroom plumbing for a refit or a new build. Call 01952 370000 for a free quote.

What we do, and what we do not

Being straight about this saves everyone time. We are plumbers and heating engineers, so we do the plumbing, the pipework, the appliances and the heating in a bathroom. Tiling, plastering and electrics are separate trades, and on a full refit they need scheduling around each other in the right order.

  • Shower installation, including mixer and thermostatic showers
  • Baths, bath and shower mixers, and shower screens
  • Basins, pedestals, vanity units and taps
  • Toilets, concealed cisterns and pan connectors
  • Waste pipework and soil connections done properly, which is where most bathroom smells come from
  • Heated towel rails and radiator moves
  • Pipework for a new bathroom, an en suite or a downstairs loo
  • Making good on the plumbing after someone else has left it half done

The thing most bathroom quotes leave out: pressure

A shower is only as good as the water going to it. A big rainfall head on a system that cannot feed it is a disappointment you have paid for, and it is the single most common regret people have about a new bathroom.

So before anyone picks a shower, the question is what feeds it: mains pressure through a combi, a gravity system off a tank in the loft, or an unvented cylinder. That answer decides which showers are worth buying and whether a pump is needed. It is a five minute conversation that saves a bad bathroom.

How long and in what order

  1. 1

    Rip out and first fix

    Old suite out, pipework and wastes moved to where the new layout needs them. This is the part that decides whether the finished room works.

  2. 2

    Other trades

    Tiling, plastering and electrics happen in the middle, once the pipework is in the walls and before everything is boxed in.

  3. 3

    Second fix

    Suite, taps, shower and towel rail fitted, connected, tested and sealed. Then we run it, check the wastes, and check nothing weeps.

The plumbing days are usually a small part of the calendar. What stretches a bathroom out is waiting on other trades and on parts, which is why knowing the order up front matters more than the quote being the cheapest.

Bathroom plumbing at a glance

  • Shower installation
  • Basin & toilet fitting
  • Waste connections
  • Full bathroom plumbing

Bathroom plumbing: common questions

Do you fit the tiles as well?
No, we do the plumbing and heating side. On a full refit we are happy to work alongside your tiler and electrician, and we can tell you the order things need to happen in.
Can I have a rainfall shower?
It depends on what feeds it. Mains pressure from a combi or an unvented cylinder usually copes. A gravity system off a loft tank often needs a pump, or a different shower. Worth checking before you buy.
Can you move the toilet to the other side of the room?
Often, yes, but the waste has to fall the right way to reach the soil pipe. That is the constraint that decides most bathroom layouts, and it is the first thing we check.
Do you do bathrooms outside Telford?
Yes, across Shropshire, including Shrewsbury, Wellington and Newport. A bathroom is booked work rather than an emergency, so distance makes very little difference to how we schedule it.
How long does a bathroom take?
The plumbing is usually a few days spread across the job. The full refit depends on the other trades and on parts arriving, and anyone quoting you a finish date before the rip out has not seen behind your walls.

Need a Plumber or Heating Engineer?

We're here to help with all your heating and plumbing needs. Get in touch today for a free, no-obligation quote.

Call WhatsApp Boiler price